Picara
Hi Chuck
Here are some more Picara
pictures. If you look at them in the right order they will tell
the building story.
I have finished the second layer
of plywood on the bottom, sealed and faired the joints and I
am about ready to do the fiberglass tape and cloth on the bottom/bilge
area. I may put that off for a month or so until the weather
warms up a little and I can work with the doors open. A rudder
or something may be a little easier and I am ready for a few
days of something besides the heavy pieces.
David
Davis
beam 3 and the stem
frame 9
frame 11
frame 14
frame 16.5
the transom